Example of a Genesis Starter Church
Phase
1 - Genesis 9700 Starter Church - Metal
The 20 acre site was Master Planned for full future capacity,
and to set the optimum location for the
Phase 1 - Genesis 9700 Starter Church to allow for future expansion/additions.
In this case, the church elected to have Akers CS build
the "shell" with members of the church doing
all the heating, plumbing, electrical, and all the inside
finishes.
New Life Christian
Fellowship,
Fortville, Indiana
|